Documents required for an electrical inspection

The drawings, test reports and certificates to have ready before you apply, by type of installation.

CEIG & Electrical Compliance · · Reviewed by the SKE engineering team · Rules last checked November 2026

Two engineers checking drawings and a tablet beside switchgear

An incomplete file is the most common reason an electrical inspection is delayed. Use this checklist before you apply for Electrical Inspector approval. Exact requirements depend on the installation and the current forms, so treat it as a starting point.

Documents for every installation

  • Application in the prescribed form, signed by the owner, with proof of the fee.
  • Ownership or tenancy proof for the premises.
  • Single line diagram showing sources, protection, ratings and earthing.
  • Layout drawing with equipment positions, cable routes and clearances.
  • Completion certificate from the licensed electrical contractor, with the supervisor’s licence details.
  • Earth resistance test report for every earth pit, with the pit locations marked.
  • Insulation resistance test report for cables and equipment.

Extra documents for transformers and HT panels

  • Manufacturer’s test certificate for the transformer, and the type test certificate where required.
  • Transformer oil BDV test report.
  • Relay test and setting report for HT protection.
  • HT cable test report.
  • Details of fencing, danger boards, fire extinguishers and the soak pit or oil drain.

Extra documents for DG sets

  • Manufacturer’s test certificate and rating plate details.
  • Changeover arrangement drawing showing that the DG cannot back-feed the grid.
  • Exhaust, fuel storage and acoustic enclosure details as applicable.

Extra documents for solar plants

  • Module, inverter and protection equipment datasheets and certificates.
  • DC and AC single line diagrams with string details.
  • Earthing and lightning protection details for the array.
  • The DISCOM’s feasibility or net metering approval.

F Form and L Form

Under the CEA regulations, an installation must be certified safe before the DISCOM connects it. The F Form and L Form are the certificates used for this. We prepare them along with the test reports so the connection is not held up.