Solar PV Consultancy, CEIG Approval & Net Metering in Jaipur & Rajasthan

Technical consultancy for rooftop and ground-mounted solar plants in Rajasthan, covering feasibility, design review, Electrical Inspector (CEIG) approval, net metering and grid synchronisation.

Engineers inspecting rooftop solar modules and inverters on a city rooftop
Since 2008All Rajasthan
JVVNL, AVVNL and JdVVNL areas

How Solar CEIG Approval & Net Metering works

Installing a solar plant is only half the job. To export power and receive credit on the electricity bill, the plant must be connected under the correct arrangement (net metering, net billing, or virtual or group net metering), comply with the RERC Distributed Renewable Energy regulations, pass the DISCOM’s technical requirements and, depending on capacity, be inspected and approved by the Electrical Inspector before synchronisation.

Shree Kalyan Enterprises supports plant owners, industries, institutions and EPC companies in Jaipur and across Rajasthan through this entire process. We review the design and SLD, check earthing and lightning protection, prepare the CEIG approval file, coordinate the DISCOM net meter installation and follow up until the plant is synchronised.

An SKE engineer on a rooftop solar plant above the city

Solar plant approval and net metering in Rajasthan

RERC
regulations govern net metering and connectivity in Rajasthan RERC DRE Regulations 2021
3
DISCOMs: JVVNL, AVVNL and JdVVNL, each with its own process Office practice
CEA
safety regulations decide when the Electrical Inspector must approve CEA 2023, Reg. 45
Limit
above which Inspectorate approval is needed: to confirm for your capacity To confirm

Who approves what for a grid-connected solar plant

CEIG approval checker
  • Statutory Required by the Act, Rules or Regulations named.
  • Office practice What the Inspectorate’s current form or office asks for. It can change without a new notification.
  • SKE advice Our recommendation from the files we handle. Not a legal requirement.
  • To confirm Not yet verified against the official Gazette or the competent authority. Confirm before relying on it.

Swipe the table sideways to see every column.

DISCOM (JVVNL, AVVNL, JdVVNL)Electrical Inspectorate
What it approves
RERC DRE Regulations 2021; CEA 2023
Feasibility, connectivity, net meter and synchronisationSafety of the installation before energising, where the capacity or voltage requires it
Rules it applies
Statutory
RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021, as amendedCEA (Measures relating to Safety and Electric Supply) Regulations, 2023
Capacity limits
To confirm
Net metering capacity is linked to your sanctioned load and a maximum set by RERC. We confirm the current cap from the latest amendment.The capacity or voltage above which Inspectorate approval is needed is quoted differently by different sources. We confirm it for your plant before you apply.
Who installs
Rules 2016, Schedule-I
A vendor registered for the scheme you use (for example PM Surya Ghar) where the scheme requires itA contractor holding a valid Rajasthan licence of the right class

Thresholds, caps and fees change with RERC amendments and State notifications.

What the rules require, and what we advise

Office practice

Drawings the DISCOM usually asks for

Single line diagram, layout, earthing diagram and the metering scheme, with inverter and module data sheets.

CEA 2023, Reg. 45

Inspection before synchronisation

Where Inspectorate approval applies, the plant is inspected and approved before it is synchronised with the grid.

Office practice

Subsidy schemes

Scheme rules (PM Surya Ghar, PM-KUSUM) add their own vendor and inspection steps on top of DISCOM and Inspectorate requirements.

SKE advice

Plan for the slowest step

Apply for DISCOM feasibility early and prepare the Inspectorate file in parallel, so installation is not waiting on paper.

Why files get sent back SKE advice

  • Plant capacity above the sanctioned load without a load extension.
  • Inverter or anti-islanding certificates missing from the file.
  • Earthing for DC and AC sides not shown separately on the drawing.
  • Installer’s contractor licence class does not cover the connection voltage.
Free tool Do I need Electrical Inspector (CEIG) approval? Answer four questions about your installation. You get an indicative answer, the documents to prepare and the next step. Open the tool

Sources and how current this is

Checked by our engineers in November 2026 against published texts of the rules. Rules, forms, fees and thresholds change; items marked “To confirm” are being verified with the competent authority. This page is general guidance, not legal advice. Shree Kalyan Enterprises is an independent consultancy and is not part of, or affiliated with, any government department, the Electrical Inspectorate or any DISCOM.

What our Solar CEIG Approval & Net Metering service covers

01

Feasibility study

Area, load, arrangement, generation and payback assessed.

02

Design & SLD review

Inverter, cabling, protection and SLD checked for compliance.

03

Earthing & LA

DC and AC earthing and lightning arrester design checked and tested.

04

CEIG approval

Electrical Inspector approval file and inspection coordination.

05

Net metering

Application, agreement, meter testing and installation with the DISCOM.

06

Synchronisation

Commissioning and synchronisation follow-up.

Documents for Solar CEIG Approval & Net Metering

  • Latest electricity bill and sanctioned load details
  • Ownership / rooftop rights document
  • Plant design, SLD and equipment datasheets
  • Module (ALMM) and inverter certificates
  • Earthing and insulation test reports
  • Electrical contractor licence and completion report
  • Net metering agreement and application forms
  • CEIG approval documents (where required)

Open your document checklist in the customer portal

Reports and approval letters

  • Feasibility report (optional)
  • Design compliance review
  • CEIG approval file and inspection support
  • Net metering application and follow-up
  • Synchronisation coordination
  • Handover file with all approvals

Regulations behind Solar CEIG Approval & Net Metering

  • RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021, including the Third Amendment, 2025
  • CEA (Technical Standards for Connectivity of Distributed Generation Resources) Regulations, as amended
  • CEA (Measures relating to Safety and Electric Supply) Regulations, 2023
  • MNRE guidelines, including ALMM requirements where applicable

Solar CEIG Approval & Net Metering in 7 steps

Net metering limits, eligibility and the need for Electrical Inspector approval depend on plant capacity, consumer category and sanctioned load. We confirm the right arrangement for your plant before design is finalised.

The SKE team in helmets and high-visibility vests at a solar site
  1. 1

    Feasibility

    Load & arrangement

  2. 2

    Design review

    SLD & protection

  3. 3

    DISCOM application

    Feasibility / approval

  4. 4

    Installation check

    Earthing & tests

  5. 5

    CEIG approval

    Where applicable

  6. 6

    Net meter

    Testing & installation

  7. 7

    Synchronisation

    Plant live

Questions about Solar CEIG Approval & Net Metering

Answered by our engineers. Ask us if yours is not here.

Ask an engineer

Does my rooftop solar plant need CEIG approval in Rajasthan?

It depends on capacity and connection voltage under the current regulations. Larger plants and HT-connected plants generally need Electrical Inspector approval before synchronisation. We check your case first.

What is net metering?

Net metering lets a consumer export surplus solar energy to the grid and adjust it against energy imported, using a bidirectional meter. The arrangement is governed by the RERC DRE regulations.

How long does net metering take?

It depends on DISCOM processing, meter availability and approvals. A complete application and early approval coordination avoid most delays.

Can solar capacity be more than my sanctioned load?

Capacity limits depend on the arrangement and current RERC regulations. We check your sanctioned load and contract demand and advise on load enhancement if needed.

Do you work with EPC companies?

Yes. Many EPCs hand over the approval and net metering work to us so that their teams can focus on execution.

Solar CEIG Approval & Net Metering across all 41 districts of Rajasthan