New Electricity Connection & Load Extension Consultancy in Rajasthan

Support for new LT and HT electricity connections, load extension and contract demand changes with JVVNL, AVVNL and JdVVNL, from application and estimate review to release.

An engineer with a tablet checking a transformer installation outdoors
Since 2008All Rajasthan
JVVNL, AVVNL and JdVVNL areas

How New Connection & Load Extension works

Getting a new electricity connection or extending load in Rajasthan involves several steps with the DISCOM: application, technical feasibility, estimate and demand note, infrastructure work, testing, Electrical Inspector approval for HT installations, agreement and finally release of the connection. A delay at any step can hold up the start of a factory, building or project for weeks.

Shree Kalyan Enterprises helps consumers with new LT and HT connections and load extensions in Jaipur (JVVNL), Ajmer (AVVNL) and Jodhpur (JdVVNL) discom areas. We check that the application is complete, review the technical feasibility and estimate for correctness, coordinate the required approvals and follow up until the connection is released.

An SKE engineer shaking hands with a client in a meeting room

What our New Connection & Load Extension service covers

01

Application preparation

Correct category, load and documents from the start.

02

Load assessment

Connected load and contract demand worked out realistically.

03

Estimate review

Demand note, line and cable estimates checked for errors.

04

Technical documents

SLD, substation details and test reports for HT cases.

05

Electrical Inspector approval

CEIG approval coordinated where required.

06

Follow-up & escalation

Regular follow-up and, if needed, representation to higher authorities.

Documents for New Connection & Load Extension

  • Application form for the required category
  • Ownership or occupancy proof of the premises
  • Identity proof and authorisation of the signatory
  • Connected load details and load calculation
  • Test report by a licensed electrical contractor
  • SLD and substation details (HT)
  • Electrical Inspector approval (HT, where required)
  • NOCs or registrations as applicable (industry, pollution, building)

Open your document checklist in the customer portal

Reports and approval letters

  • Load and category assessment
  • Complete application file
  • Estimate review note
  • Approval coordination
  • Follow-up until release
  • Representation if the case is delayed

Regulations behind New Connection & Load Extension

  • Electricity Act, 2003
  • RERC Electricity Supply Code and Connected Matters Regulations, as amended
  • RERC Standards of Performance for distribution licensees
  • DISCOM procedures and orders (JVVNL / AVVNL / JdVVNL)

New Connection & Load Extension in 7 steps

Charges, timelines and documents vary with category, voltage and load. RERC standards of performance set time limits for many DISCOM activities, which we use when a case is delayed.

The SKE team in helmets and high-visibility vests at a solar site
  1. 1

    Assessment

    Load & category

  2. 2

    Application

    Filed with DISCOM

  3. 3

    Feasibility

    Technical sanction

  4. 4

    Estimate

    Reviewed & paid

  5. 5

    Works

    Line / substation

  6. 6

    Approvals

    Testing & CEIG

  7. 7

    Release

    Connection energised

Questions about New Connection & Load Extension

Answered by our engineers. Ask us if yours is not here.

Ask an engineer

How long does a new HT connection take in Rajasthan?

It depends on line and substation work, approvals and DISCOM processing. A complete application and early Electrical Inspector coordination avoid the most common delays.

Can you check if the DISCOM estimate is correct?

Yes. We review demand notes and estimates and, where items or quantities look incorrect, help you raise a representation.

What is the difference between connected load and contract demand?

Connected load is the total rating of equipment connected. Contract demand is the maximum demand agreed with the DISCOM. Setting contract demand correctly affects both charges and infrastructure.

Do I need CEIG approval for a load extension?

For HT installations and transformer changes, yes, usually. For LT cases it depends on the installation. We confirm this for your case.

My load extension file is stuck. Can you help?

Yes. We find where the file is stuck, check timelines under RERC standards and follow up or escalate as appropriate.

New Connection & Load Extension across all 41 districts of Rajasthan

We handle this work with all three DISCOMs, from our Jaipur office. Find your area:

Cities: Jaipur · Jodhpur · Udaipur · Kota · Ajmer · Bhilwara · Bikaner · Alwar and Bhiwadi · Sikar · Barmer and Balotra