Wireman Licence (Permit to Work) in Rajasthan

Support for obtaining and renewing a Rajasthan wireman permit to work, with eligibility check, experience documentation, application and renewal.

An SKE engineer in a helmet testing a live panel with a clamp meter
Since 2008All Rajasthan
JVVNL, AVVNL and JdVVNL areas

How Wireman Licence works

A wireman permit, commonly called a wireman licence, allows the holder to carry out electrical wiring work in Rajasthan. It is issued by the Electrical Inspectorate Department under the Rajasthan licensing rules of 2016 and is valid only within the state, under the conditions set in those rules.

Wiremen are a required part of every electrical contractor’s staff, so a valid permit improves job opportunities and helps contractors maintain their licence class. Eligibility is based on basic education and practical experience as a trainee, apprentice or helper under a licensed contractor, through either an examination or an exemption route.

The SKE team in helmets and high-visibility vests at a solar site

Wireman competency certificate and permit to work

2
routes: examination for a certificate, or a permit on qualification Rule 5, Schedule-III
5
days to issue a permit after a complete application Rule 20
25%
maximum share of apprentices in a contractor’s wiring staff Rule 24(1)
65
age up to which the permit stays valid, with medical certificates Rule 8

Wireman permit and supervisor certificate: the difference

Contractor licence class finder
  • Statutory Required by the Act, Rules or Regulations named.
  • Office practice What the Inspectorate’s current form or office asks for. It can change without a new notification.
  • SKE advice Our recommendation from the files we handle. Not a legal requirement.
  • To confirm Not yet verified against the official Gazette or the competent authority. Confirm before relying on it.

Swipe the table sideways to see every column.

WiremanSupervisor (Class B)
What it is for
Rules 4, 5, 22
Doing wiring and electrical work under a licensed contractorSupervising electrical work up to 33 kV and signing completion reports (Form-F)
By examination
Schedules II, III
Passed 8th class (CBSE, ICSE or a state board) and 5 years as trainee, apprentice or helper under a licensed A, B or C contractor or a specified company in RajasthanSenior secondary (PCM) or 2-year ITI, a Rajasthan wireman permit and 5 years as electrician or wireman in Rajasthan
Without examination
Schedules II, III
Degree or diploma in electrical engineering, 2-year ITI, or a National Apprenticeship Certificate; or 2-year ITI with a wireman permit from another stateA Rajasthan wireman permit and 10 years of practical experience in Rajasthan
Next step
Schedule-II
A wireman permit is the starting point for both supervisor classesClass A supervisor after 5 years as Class B

Wiremen and supervisors are counted in a contractor’s staff under Schedule-I.

What the rules require, and what we advise

Rule 8

Validity

Valid until age 65 with a medical fitness certificate (Form-H) at the start and every 5 years; after 65, a Form-H from a Government hospital every year.

Rule 10(2)

Documents

Specimen signature, three attested colour photographs, self-attested qualification and experience proof, fee, photo ID and medical certificate.

Rule 24(1)

Apprentices

Apprentices may be no more than 25% of a contractor’s wiring staff and may work only under direct supervision.

Rule 26

Not transferable

A licence, certificate or permit cannot be transferred to another person.

To confirm

Exam schedule

Exam dates and the examining body are announced by the Inspectorate from time to time.

Why files get sent back SKE advice

  • Experience letters from helpers’ employers who were not licensed contractors for that period.
  • An ITI certificate for a 1-year trade where the route needs a 2-year ITI.
  • Photographs attested by someone other than a Gazetted Officer.
Free tool Which electrical contractor licence class do I need? Tell us the work you do and your team. You get the licence class that fits and what it takes to apply. Open the tool

What you pay, and to whom

Rule 2(n)

Government fees

Application, licence and renewal fees are set by the State Government and revised from time to time (Rule 2(n)). They are paid to the Inspectorate at actuals under the notification in force on the day you apply. We do not quote government fees from memory or from other websites; we confirm the current figure with the office before you pay.

Office practice · Rule 3(2)(e); Form-B

Solvency (not a fee)

A solvency certificate for the class amount, in the applicant’s name. It is a financial requirement, not a payment to anyone. The Rules allow a Tehsildar or nationalised bank certificate; the Inspectorate’s current Form-B asks for a nationalised bank in Rajasthan, valid for at least five years.

SKE advice

SKE professional fee

Our consultancy charge for eligibility check, file preparation, tools checklist, inspection support and follow-up. Quoted in writing before we start, separate from every government payment.

SKE advice

Other expenses

Costs you may pay to others: calibration of the megger and earth tester by an accredited laboratory, attestation of photographs, medical fitness certificates, the cost of the application form, and travel for the tools inspection outside Jaipur.

Government fees are payable separately at actuals, under the notification in force when you apply. Our professional fee never includes them.

Sources and how current this is

Checked by our engineers in November 2026 against published texts of the rules. Rules, forms, fees and thresholds change; items marked “To confirm” are being verified with the competent authority. This page is general guidance, not legal advice. Shree Kalyan Enterprises is an independent consultancy and is not part of, or affiliated with, any government department, the Electrical Inspectorate or any DISCOM.

What our Wireman Licence service covers

01

Eligibility check

Education and experience checked against the rules.

02

Experience certificate

Experience proof prepared with the contractor’s licence details.

03

Exam guidance

Guidance on the exam or exemption route.

04

Application

Form, photo, documents and fee submitted.

05

Renewal

Renewal before the permit expires.

06

Contractor records

Staff register (Form-E) kept current for contractors.

Documents for Wireman Licence

  • Application form with photograph
  • Educational certificate (minimum qualification as per rules)
  • ITI certificate (if applicable)
  • Experience certificate from a licensed contractor
  • Identity and address proof
  • Fee payment proof

Open your document checklist in the customer portal

Reports and approval letters

  • Eligibility check
  • Application file
  • Route guidance
  • Follow-up until permit issue
  • Renewal reminders

Regulations behind Wireman Licence

  • Rajasthan Electrical Inspectorate (Formation of Technical Committee and Grant of Licence, Competency Certificate to work and Permit to work) Rules, 2016

Wireman Licence in 5 steps

Minimum education, years of experience and fees are set by the rules and Inspectorate notifications. We confirm current conditions when you apply.

An SKE engineer shaking hands with a client in a meeting room
  1. 1

    Eligibility

    Education & experience

  2. 2

    Documents

    Proofs ready

  3. 3

    Route

    Exam or exemption

  4. 4

    Application

    Submitted

  5. 5

    Permit

    Issued

Questions about Wireman Licence

Answered by our engineers. Ask us if yours is not here.

Ask an engineer

What is a wireman licence in Rajasthan?

It is a permit to work as a wireman issued by the Electrical Inspectorate Department, Rajasthan. It allows the holder to carry out wiring work in Rajasthan under the conditions of the 2016 rules.

Who is eligible?

Candidates with the minimum education and practical experience as a trainee, apprentice or helper under a licensed contractor, as defined in the rules. ITI qualification can help.

Is the permit valid outside Rajasthan?

It is issued under the Rajasthan rules for work in Rajasthan. Other states issue their own permits; a wireman permit from another state can be a route to the Rajasthan permit for 2-year ITI holders (Schedule-III).

How long is the permit valid?

Up to age 65, with a medical fitness certificate (Form-H) at the start and every five years; after 65, every year from a Government hospital doctor (Rule 8).

Do contractors need permitted wiremen?

For Classes A, B and C, yes: Schedule-I sets the minimum (4, 2 and 1 wiremen respectively). Class D has no staff requirement.

Wireman Licence across all 41 districts of Rajasthan

We handle this work with all three DISCOMs, from our Jaipur office. Find your area:

Cities: Jaipur · Jodhpur · Udaipur · Kota · Ajmer · Bhilwara · Bikaner · Alwar and Bhiwadi · Sikar · Barmer and Balotra

WhatsApp