Registering a solar project with RRECL: what to keep ready

The nodal agency, the policy and the documents a company should collect before applying.

Solar & Renewable Energy · · Reviewed by the SKE engineering team · Rules last checked November 2026

Engineers inspecting rooftop solar modules and inverters on a city rooftop

Under the Rajasthan Integrated Clean Energy Policy, 2024, the Rajasthan Renewable Energy Corporation (RREC) is the nodal agency for renewable energy projects. A company planning a captive or third-party sale solar project applies to it online for registration.

Details asked for

Applicant and director details, the project category, proposed capacity, location, land, the grid substation and voltage of connection, the technology, any battery storage and the estimated cost.

Documents to keep ready

  • Certificate of incorporation, memorandum and articles of association
  • GST registration and PAN of the applicant
  • Proof of contract demand, such as a recent electricity bill
  • Authority letter or power of attorney for the signatory
  • Net worth certificate and audited financial statements

Capacity limits, storage requirements, fees and timelines are set by the policy and the applicable regulations, which are amended from time to time. Read the policy and amendment and check the current position before filing.

WhatsApp