Documents for Solar CEIG Approval & Net Metering

Technical consultancy for rooftop and ground-mounted solar plants in Rajasthan, covering feasibility, design review, Electrical Inspector (CEIG) approval, net metering and grid synchronisation.

Upload in the customer portal

Documents to prepare

What you receive

  • Feasibility report (optional)
  • Design compliance review
  • CEIG approval file and inspection support
  • Net metering application and follow-up
  • Synchronisation coordination
  • Handover file with all approvals

Regulations that apply

  • RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021, including the Third Amendment, 2025
  • CEA (Technical Standards for Connectivity of Distributed Generation Resources) Regulations, as amended
  • CEA (Measures relating to Safety and Electric Supply) Regulations, 2023
  • MNRE guidelines, including ALMM requirements where applicable

Requirements can vary with the installation and current notifications. Our engineers confirm the exact list for your case. Read more: Solar CEIG Approval & Net Metering.

WhatsApp