SolarHPCL Renewable Energy
Solar + BESS consultancy and techno-feasibility report.
Project details
- Client
- HPCL Renewable Energy
- Location
- Pachpadra, Rajasthan
- Size
- 252 MW
- Our role
- Solar + BESS consultancy and techno-feasibility report
Statutory approvals, licences, DISCOM and regulatory matters, audits and testing for industry, buildings and solar. Mentored by a retired Chief Engineer of JVVNL and former Electricity Ombudsman of Rajasthan.
Since 2008, across the Jaipur, Ajmer and Jodhpur DISCOM areas (JVVNL · AVVNL · JdVVNL)
I am a…
From feasibility to synchronisation: CEIG, net metering and vendor registration with all three DISCOMs.
252 MW HPCL Renewable Energy, Pachpadra
Try the solar savings and subsidy calculatorLower bills and fewer disputes: audits, power factor, load changes and CGRF or Ombudsman cases.
500 kW Dynamic Cables, Bhilwara
Try the electricity bill checkLicences that stay valid: new Class A to D, renewal, restoration and supervisor licences.
Approvals and safety for hotels, hospitals and offices: CEIG, DG sets, fire and electrical safety audits.
2 MW Intech Organics, Jaipur
Try the cEIG approval checkerIndependent certification: valuation, third-party inspection and Chartered Engineer certificates.
Refinery HPCL Rajasthan, Baran
Trusted by
All clients
CEIG approval of HT, DG, transformer and solar installations, F Form and L Form.
ExploreContractor, supervisor and wireman licences, Chartered Engineer certificates.
ExploreFeasibility, net metering, PM Surya Ghar and DRE-PMT registration, open access.
ExploreConnections and load, HT and transformer design, VCR, CGRF and Ombudsman cases.
ExploreSafety, fire and energy audits, power quality, testing and third-party inspection.
Explore
Our mentor and Chief Technical Advisor, Ram Avtar Sharma, served JVVNL for 38 years, retiring as Chief Engineer, and was Rajasthan’s Electricity Ombudsman for two and a half years. We bring that inside knowledge of the regulator to every approval, dispute and design we handle.
Ram Avtar Sharma · Retd. Chief Engineer, JVVNL · Ex Electricity Ombudsman, Rajasthan · CESE · Chartered Engineer · Valuer (P&M)
Eastern Rajasthan: we file approvals, connections and disputes with Jaipur Vidyut Vitran Nigam (JVVNL) every week. Recent work here: Intech Organics, Jaipur (2 MW); Jaipur Municipal Corporation, Jaipur (500 kWp); HPCL Rajasthan, Baran (Refinery).
Jaipur zone servicesCentral and southern Rajasthan: we file approvals, connections and disputes with Ajmer Vidyut Vitran Nigam (AVVNL) every week. Recent work here: Dynamic Cables, Bhilwara (500 kW).
Ajmer zone servicesWestern Rajasthan: we file approvals, connections and disputes with Jodhpur Vidyut Vitran Nigam (JdVVNL) every week. Recent work here: HPCL Renewable Energy, Pachpadra (252 MW); JK Cement Works, Pali (11 kV).
Jodhpur zone services
SolarSolar + BESS consultancy and techno-feasibility report.
ApprovalsCEIG approval and compliance for a chemical plant.
AuditsEnergy audit of a textile plant with priced savings.
SolarPM Surya Ghar rooftop consultancy, on net metering.
AuditsElectrical safety audit and compliance.
EngineeringHT panel design, installation and testing.
HT connections, CEIG approvals, safety and energy audits, power quality.
Feasibility, net metering, PM Surya Ghar and DRE-PMT registration, open access.
Substations, DG sets, lifts, fire and electrical safety audits.
Load calculation, drawings, new connections and F Form and L Form.
Third-party inspection, plant valuation and Chartered Engineer certificates.
Contractor, supervisor and wireman licences, renewals and restoration.
Answer four questions about your installation. You get an indicative answer, the documents to prepare and the next step.
Enter your monthly bill, load and roof area. You get an indicative system size, PM Surya Ghar subsidy, savings and payback.
Tell us the work you do and your team. You get the licence class that fits and what it takes to apply.
Enter your load and power factor from the bill. You get the capacitor size needed and what low power factor is costing you.
Copy a few figures from your bill. The check flags excess demand, low power factor, an oversized contract demand and category issues.
Every district, its DISCOM and our projects there.

Tell us what you need and send the documents you have. We confirm the rules that apply, the scope and the fee.

Our engineers visit, test, design or prepare the application, and list every gap before the authority sees it.

We attend inspections and hearings and follow up until the approval, licence, report or order is in your hands.
5,524 energy and safety audits and 560+ clients since 2008. Meet the team

Mentored by a retired JVVNL Chief Engineer and former Electricity Ombudsman of Rajasthan.
We tell you in writing what the rules require for your installation, what it will take and what it will cost.
One team for design, testing, approvals, licences, DISCOM cases and audits, so nothing falls between firms.
Class A contractor licence, Chartered Electrical Safety Engineers, BEE energy auditor and registered valuer.
The ones we hear most often, answered by our engineers.
Read all questionsCEIG/electrical inspector approval is a statutory electrical-safety approval applicable to specified electrical installations under the relevant electricity laws, rules and safety regulations.
Net metering is a billing arrangement for an eligible grid-connected renewable-energy system under which electricity imported from and exported to the distribution network is measured and accounted for according to the applicable regulations and tariff framework.
Earthing provides a controlled path for fault current and helps protective devices operate correctly. Proper earthing reduces risks of electric shock, equipment damage and electrical fire.
Sanctioned load is the electrical load approved for a consumer's connection under the applicable supply conditions.