An electrical safety audit is a systematic check of an installation against the CEA safety regulations, the relevant Indian Standards and good practice. Factories, hospitals, hotels and commercial buildings use it to find hazards before they cause a shock, a fire or a shutdown, and insurers and fire authorities often ask for one.
What the auditor inspects
- Incoming supply and substation: transformer condition, HT panel, protection relays, clearances, fencing and fire safety.
- Earthing: number and condition of earth pits, earth resistance, continuity of earth conductors, separate earthing for neutral and body where required.
- Panels and distribution boards: ratings, breaker and fuse coordination, loose connections, overheating, ingress protection and labelling.
- Cables: sizing against load, routing, support, joints and damage.
- Protection: earth leakage protection, overload and short-circuit settings, surge protection.
- DG sets and UPS: changeover, earthing and ventilation.
- Hazardous areas: suitability of equipment where flammable materials are stored or used.
- Records: drawings, test registers, licences and approvals.
The tests involved
A thorough audit combines inspection with testing: earth resistance, insulation resistance, loop impedance, RCD trip tests and thermography of panels under load. Thermography finds hot joints and overloaded breakers that look normal to the eye.
What the report gives you
The report lists each observation with its location, the risk, the applicable rule and a recommended fix, ranked by urgency. A good report is one your maintenance team can work from directly, with photographs and thermal images.
How often to audit
Many organisations audit once a year, and after any major change to the installation. High-risk sites may need more frequent checks. Your insurer, fire authority or the Electrical Inspector may set their own requirements.
How we help
Our audits are led by Chartered Electrical Safety Engineers and BEE certified auditors. We test, report and, if you want, help you close the observations and prepare for the Electrical Inspector’s periodic inspection.