PM Surya Ghar vendor registration in Rajasthan

What a solar company needs to register on the national portal for PM Surya Ghar, the documents involved and how to keep the registration in good standing.

PM Surya Ghar · · Reviewed by the SKE engineering team · Rules last checked November 2026

An SKE engineer on a rooftop solar plant above the city

Under PM Surya Ghar: Muft Bijli Yojana, households can claim central financial assistance only when their rooftop system is installed by a vendor registered on the National Portal for Rooftop Solar. For a solar installer in Rajasthan, registration is the entry ticket to the scheme.

What the scheme pays households

The central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capped at ₹78,000 for systems of 3 kW and above. It is paid to the household’s bank account after the system is commissioned and the net meter is installed. Residential welfare associations and group housing societies have a separate rate for common facilities. Check the portal for the current rates before quoting.

Who can register as a vendor

Requirements are set by MNRE and the state implementing agencies and change from time to time. Typically a vendor needs:

  • A registered business with PAN and GST registration.
  • A valid electrical contractor licence in the state, or a tie-up with a licensed contractor.
  • Technical staff with the required qualifications.
  • Commitment to use ALMM-listed modules and equipment that meets the scheme’s standards.
  • Bank details and the applicable registration fee or performance guarantee.

The registration steps

  1. Create a vendor account on the national portal and choose Rajasthan and the DISCOM areas you will serve.
  2. Upload the business, licence, technical and bank documents.
  3. Submit any fee or guarantee required.
  4. Wait for verification by the state agency or DISCOM; answer any queries promptly.
  5. Once approved, your company appears in the vendor list households choose from.

Staying in good standing

Registration is not the end. Vendors are rated on the portal, and installations are inspected. Keep the electrical contractor licence current, upload commissioning documents on time, use compliant equipment, and answer customer complaints. Rajasthan has also launched the Distributed Renewable Energy Project Monitoring Tool (DRE-PMT), which brings its own registration and reporting duties for vendors.

How we help

We prepare and file vendor registrations, arrange the electrical contractor licence if you need one, and handle the CEIG and net metering side of your installations. More than 400 Rajasthan installers have registered through us.

WhatsApp