Solar EPC

Solar BOM generator

Enter the plant and site details. Quantities are estimates for planning and quotations; confirm against the final layout and drawings.

kWp
Wp
V
m
m

Result

Results appear here as you type.

Get this checked by an engineer

Indicative only. Rules, tariffs and site conditions vary; SKE engineers confirm the exact figures for approvals and designs.

Formula and basis

Modules = kWp × 1000 ÷ Wp. Inverter AC kW = kWp ÷ DC:AC ratio. Strings sized for about 700 V (three phase) or 350 V (single phase). DC cable = 2 × run × strings + 10%. Structure: about 70 kg/kWp elevated GI on RCC, 20 kg/kWp rails on sheds, 90 kg/kWp ground mounted. Earthing: separate pits for DC, AC and lightning arrester.

Solar CEIG Approval & Net Metering: how SKE helps

Questions

Does this include prices?

No. Material prices change weekly; add your supplier rates in the Excel file. SKE can review your BOM and drawings for CEIG and net-metering approval.