CEIG / Electrical Inspector Approval Consultant in Jaipur & Rajasthan
End-to-end Electrical Inspector (CEIG) approval for solar plants, DG sets, transformers and HT installations across Rajasthan, from drawings and documentation to inspection and energisation approval.
How CEIG Approval & Liaisoning works
Before a new HT installation, transformer, DG set or grid-connected solar plant can be energised in Rajasthan, it must satisfy the Central Electricity Authority (CEA) safety regulations and, where applicable, be inspected and approved by the Electrical Inspectorate, Government of Rajasthan. This approval is commonly called CEIG approval or Electrical Inspector approval.
Shree Kalyan Enterprises has been handling CEIG approvals in Jaipur and across Rajasthan since 2008. We prepare the technical file, check the installation against the regulations before the inspector arrives, coordinate the inspection and follow up until the approval or energisation permission is issued. Because most delays come from incomplete drawings, missing test reports or site observations, our pre-inspection check is the most valuable part of the service.

Electrical Inspector (CEIG) approval for new and modified installations
- Before
- energising: installations above the notified voltage need the Electrical Inspector’s approval CEA 2023, Reg. 45
- ≤5
- years between periodic inspections or self-certifications CEA 2023, Reg. 32(2)
- State
- notifies the voltage up to which self-certification applies CEA 2023, Reg. 2
- CESE
- Chartered Electrical Safety Engineers assist owners with self-certification CEA 2023
Inspector approval or self-certification: which applies
CEIG approval checker- Statutory Required by the Act, Rules or Regulations named.
- Office practice What the Inspectorate’s current form or office asks for. It can change without a new notification.
- SKE advice Our recommendation from the files we handle. Not a legal requirement.
- To confirm Not yet verified against the official Gazette or the competent authority. Confirm before relying on it.
Swipe the table sideways to see every column.
| Above the notified voltage | At or below the notified voltage | |
|---|---|---|
| Before first energising CEA 2023, Reg. 45 | Inspected and tested by the Electrical Inspector, who approves energisation | Self-certified by the owner, supplier or consumer in the prescribed format |
| Periodic inspection CEA 2023, Reg. 32 | By the Electrical Inspector at intervals not exceeding five years | Self-certified by the owner at intervals not exceeding five years, with the report sent to the Inspector |
| Who can help CEA 2023 | A consultant prepares the file, pre-checks the site and attends the inspection | A Chartered Electrical Safety Engineer authorised by the State Government |
| Rajasthan’s notified voltage To confirm | To be confirmed from the State Government’s current notification | To be confirmed from the State Government’s current notification |
The State’s own Powers and Functions Rules, 2016 also govern how the Rajasthan Inspectorate works.
What the rules require, and what we advise
Modified or long-disconnected installations
A modification, or an installation that has stayed disconnected for a long period, may need fresh approval before re-energising. We confirm the exact condition and regulation number for your case.
Installer’s licence
Installation work must be done by a contractor holding a valid Rajasthan licence of the right class for the voltage, with the supervisor signing the completion report.
Inspection fees
Inspection fees are set by the State Government and revised from time to time. They are paid at actuals; we confirm the current schedule before you pay.
Pre-inspection check
Most observations are avoidable: earth resistance, clearances, protection settings, cable schedules and test reports. We check them against the regulations before the inspector arrives.
Why files get sent back SKE advice
- The SLD on file does not match what is built on site.
- Earth resistance values measured in wet weather, or without the test method recorded.
- Contractor’s licence class does not cover the installation voltage.
- Missing routine test certificates for the transformer, panels or inverters.
- Fire and clearance requirements around transformers and DG sets not met.
Sources and how current this is
- CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 (Gazette of India)
- Rajasthan Chief Electrical Inspector and Electrical Inspectors (Powers and Functions) Rules, 2016 (G.S.R. 164, 28.3.2016)
Checked by our engineers in November 2026 against published texts of the rules. Rules, forms, fees and thresholds change; items marked “To confirm” are being verified with the competent authority. This page is general guidance, not legal advice. Shree Kalyan Enterprises is an independent consultancy and is not part of, or affiliated with, any government department, the Electrical Inspectorate or any DISCOM.
What our CEIG Approval & Liaisoning service covers
Drawing preparation & review
Single line diagram (SLD), layout, earthing layout and cable schedule prepared or checked against CEA requirements.
Application & documentation
Complete application file with test reports, equipment certificates, contractor licence details and fee challan.
Pre-inspection site check
We inspect the installation before the official inspection and list every gap that could trigger an observation.
Testing support
Earth resistance, insulation resistance (Megger), relay and transformer tests arranged and documented.
Inspection coordination
Scheduling with the Electrical Inspectorate and attending the inspection with your team.
Observation compliance
Point-by-point compliance of inspector observations and resubmission until approval is issued.
Documents for CEIG Approval & Liaisoning
- Application form and inspection fee challan
- Single line diagram and equipment layout
- Earthing layout and earth resistance test report
- Insulation resistance (Megger) test reports
- Transformer / DG set / inverter test certificates
- Electrical contractor licence and completion report
- Supervisor competency details
- DISCOM sanction or feasibility letter (where applicable)
- Ownership or lease document of the premises
- Photographs of the installation
Reports and approval letters
- Checked technical file ready for submission
- Pre-inspection gap report with corrective actions
- Inspection attended by our engineer
- Observation compliance report
- Approval / energisation permission follow-up
- Guidance on periodic inspection afterwards
Regulations behind CEIG Approval & Liaisoning
- CEA (Measures relating to Safety and Electric Supply) Regulations, 2023, as amended
- Rajasthan Chief Electrical Inspector and Electrical Inspectors (Powers and Functions) Rules, 2016
- RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021, as amended (for solar)
- Relevant Indian Standards for earthing, cables and switchgear
CEIG Approval & Liaisoning in 7 steps
Whether an installation needs inspection by the Electrical Inspector or can be self-certified depends on voltage, capacity and type of installation under the current CEA regulations. Fees and thresholds are revised from time to time, so we confirm the current requirement for your installation before you apply.

- 1
Site study
Installation details & capacity
- 2
Drawings
SLD, layout & earthing
- 3
Documents
Tests, certificates, licence
- 4
Pre-check
Our internal inspection
- 5
Application
Submission & fees
- 6
Inspection
Electrical Inspector visit
- 7
Approval
Energisation permission
Questions about CEIG Approval & Liaisoning
Answered by our engineers. Ask us if yours is not here.
Ask an engineerWhat is CEIG approval?
CEIG approval is the approval given by the Electrical Inspectorate after inspecting a new or modified electrical installation for compliance with the CEA safety regulations. Installations that require it cannot be energised or synchronised until it is issued.
Which installations need Electrical Inspector approval in Rajasthan?
Typically HT installations above 650 V, consumer-owned transformers and substations, DG sets above the notified capacity and grid-connected solar plants above the applicable limit. The exact requirement depends on current CEA regulations and Rajasthan rules, which we check for each case.
How long does CEIG approval take?
When the file is complete and the installation passes inspection, approval can be quick. Most delays come from incomplete documents or site observations, which is why we do a pre-inspection check first.
Do you handle CEIG approval outside Jaipur?
Yes. We handle approvals across Rajasthan in JVVNL, AVVNL and JdVVNL areas, including projects in Bhilwara, Pachpadra, Jodhpur, Ajmer and other districts.
What happens if the inspector raises observations?
We prepare a point-by-point compliance plan, help your contractor close each observation with evidence and resubmit until the approval is granted.
Can you also prepare the drawings and do the testing?
Yes. We can prepare the SLD, earthing layout and test reports, or review drawings prepared by your EPC or contractor.
CEIG Approval & Liaisoning across all 41 districts of Rajasthan
We handle this work with all three DISCOMs, from our Jaipur office. Find your area:
- Jaipur zone (JVVNL)Eastern Rajasthan
- Ajmer zone (AVVNL)Central and southern Rajasthan
- Jodhpur zone (JdVVNL)Western Rajasthan
Cities: Jaipur · Jodhpur · Udaipur · Kota · Ajmer · Bhilwara · Bikaner · Alwar and Bhiwadi · Sikar · Barmer and Balotra