DG Set Inspection, Approval & Compliance in Rajasthan (100 kVA to 1000 kVA)

Inspection, Electrical Inspector approval and compliance support for diesel generator sets from 100 kVA to 1000 kVA, covering earthing, changeover, protection and documentation.

An SKE engineer explaining an electrical drawing to a client beside switchgear panels
Since 2008All Rajasthan
JVVNL, AVVNL and JdVVNL areas

How DG Set Inspection & Approval works

Diesel generator (DG) sets are a major source of electrical and fire risk if they are not installed correctly. A DG set connected to a building or plant must have proper neutral and body earthing, a changeover arrangement that prevents back-feeding into the DISCOM network, correctly rated protection and safe cable routing. Depending on capacity and installation type, it also needs inspection and approval from the Electrical Inspectorate before regular use.

We handle DG set approvals from 100 kVA to 1000 kVA for factories, hospitals, hotels, malls, residential societies, banks and telecom sites in Jaipur and across Rajasthan. We check the installation against the CEA safety regulations, prepare the documentation, coordinate the inspection and close any observations.

An engineer testing an HT panel with a meter inside an electrical room

What our DG Set Inspection & Approval service covers

01

Earthing check

Neutral and body earthing, separate earth pits and earth resistance values.

02

Changeover & interlocking

AMF / changeover panel checked to prevent parallel or back-feed to the DISCOM supply.

03

Protection review

Breaker rating, earth fault, overload and short-circuit protection.

04

Cabling

Cable size, routing, termination and glanding.

05

Fire & safety

Fuel storage, exhaust routing, clearances, extinguishers and signage.

06

Approval file

Application, test reports, SLD and coordination of the Electrical Inspector’s inspection.

Documents for DG Set Inspection & Approval

  • DG set and alternator test certificates from the manufacturer
  • Single line diagram showing the changeover arrangement
  • Earth resistance test report (neutral and body)
  • Insulation resistance test report of cables
  • Electrical contractor licence and completion certificate
  • AMF / changeover panel details
  • Site layout showing the DG location
  • Inspection fee challan

Open your document checklist in the customer portal

Reports and approval letters

  • DG set compliance inspection report
  • Earthing and IR test results
  • Corrective action list with priorities
  • Approval application and follow-up
  • Observation compliance support
  • Periodic inspection reminder

Regulations behind DG Set Inspection & Approval

  • CEA (Measures relating to Safety and Electric Supply) Regulations, 2023, as amended
  • Rajasthan Electrical Inspectorate procedures for generating sets
  • Applicable CPCB norms for DG set emissions and noise (where relevant)

DG Set Inspection & Approval in 7 steps

Approval thresholds for generating sets depend on the current CEA regulations and Rajasthan notifications. We confirm what applies to your DG set before any application is made.

The SKE team in helmets and high-visibility vests at a solar site
  1. 1

    Details

    kVA, make, location

  2. 2

    Site inspection

    Earthing, panel, cabling

  3. 3

    Testing

    Earth & IR tests

  4. 4

    Gap report

    Corrections listed

  5. 5

    Application

    File & fees

  6. 6

    Inspection

    Inspector visit

  7. 7

    Approval

    Compliance closed

Questions about DG Set Inspection & Approval

Answered by our engineers. Ask us if yours is not here.

Ask an engineer

Does every DG set need Electrical Inspector approval?

Not every DG set. The requirement depends on capacity, voltage and the current regulations. Larger sets serving buildings and plants usually do. We check your specific installation first.

Why is changeover interlocking so important?

Without a proper interlock, the DG set can back-feed into the DISCOM network and endanger line staff. Inspectors check this carefully, and it is a common reason for observations.

How many earth pits does a DG set need?

A DG set normally needs separate earth electrodes for neutral and body earthing, with values meeting the applicable standards. The exact number depends on the installation, which we determine on site.

Can you inspect an existing DG set for compliance?

Yes. We carry out compliance inspections of existing DG sets, test the earthing and insulation, and give a corrective action list.

Do you handle DG sets above 1000 kVA?

Yes, on request. Larger and synchronised sets need detailed protection studies, which we scope separately.

DG Set Inspection & Approval across all 41 districts of Rajasthan

We handle this work with all three DISCOMs, from our Jaipur office. Find your area:

Cities: Jaipur · Jodhpur · Udaipur · Kota · Ajmer · Bhilwara · Bikaner · Alwar and Bhiwadi · Sikar · Barmer and Balotra

WhatsApp