Electrical Drawing and Design Consultant in Jaipur & Rajasthan

Single line diagrams, layouts, earthing and lightning protection drawings, prepared and signed for construction, CEIG approval and DISCOM files.

An engineer holding drawings in an office with a solar plant model and live dashboards
Since 2008All Rajasthan
JVVNL, AVVNL and JdVVNL areas

How Electrical Drawing & Design works

Every approval file starts with drawings. The Electrical Inspector and the DISCOM check the single line diagram and layouts against the site, and a drawing that is incomplete or does not match the installation is one of the most common reasons for delay.

We prepare electrical drawings for new projects and for existing installations that were never documented: single line diagrams, panel schedules, cable routes, equipment layouts, earthing and lightning protection, and lighting and power layouts for buildings.

SKE engineers at work in the Jaipur office with drawings and screens

What our Electrical Drawing & Design service covers

01

Single line diagrams

HT and LT schemes with ratings and protection.

02

Equipment layouts

Substation, panel room and DG layouts with clearances.

03

Cable routes and schedules

Cable sizes, routes and trench details.

04

Earthing and lightning

Earthing grid and lightning protection design.

05

Building services

Lighting and power layouts for buildings.

06

Approval drawings

Drawings formatted for CEIG and DISCOM files.

Documents for Electrical Drawing & Design

  • Site plan or architectural drawings
  • Equipment list with ratings
  • Existing drawings, if any
  • DISCOM feasibility letter (for approval drawings)

Open your document checklist in the customer portal

Reports and approval letters

  • Single line diagram
  • Equipment and cable layouts
  • Earthing and lightning protection drawings
  • Cable schedule and panel schedules
  • Drawings in PDF and CAD format

Regulations behind Electrical Drawing & Design

  • CEA (Measures relating to Safety and Electric Supply) Regulations, 2023
  • IS 3043 (earthing) and IS/IEC 62305 (lightning protection)
  • National Building Code of India, Part 8: Building Services

Electrical Drawing & Design in 6 steps

Approval drawings must match the installation on site; we check the site before issuing them.

The SKE team in helmets and high-visibility vests at a solar site
  1. 1

    Brief

    Project and purpose of drawings

  2. 2

    Survey

    Site measurement if existing

  3. 3

    Design

    Calculations and scheme

  4. 4

    Drafting

    CAD drawings

  5. 5

    Review

    Your comments

  6. 6

    Issue

    Final signed drawings

Questions about Electrical Drawing & Design

Answered by our engineers. Ask us if yours is not here.

Ask an engineer

Which drawings does the Electrical Inspector need?

Usually the single line diagram and the layout of the equipment being approved, with earthing details. Some installations need more, which we confirm for your case.

Can you make drawings for an old installation?

Yes. We survey the site and prepare as-built drawings, which you need for approvals, audits and maintenance.

Do you give CAD files?

Yes, drawings are issued in PDF and in CAD format.

Do you design earthing and lightning protection?

Yes, with calculations to the Indian Standards and layouts for the contractor.

Electrical Drawing & Design across all 41 districts of Rajasthan

We handle this work with all three DISCOMs, from our Jaipur office. Find your area:

Cities: Jaipur · Jodhpur · Udaipur · Kota · Ajmer · Bhilwara · Bikaner · Alwar and Bhiwadi · Sikar · Barmer and Balotra

WhatsApp