F Form & L Form Services for Electrical Installations in Rajasthan

Inspection, testing and preparation of F Form and L Form certificates under the CEA safety regulations, which certify an electrical installation before the DISCOM releases an electricity connection.

An SKE engineer shaking hands with a client in a meeting room
Since 2008All Rajasthan
JVVNL, AVVNL and JdVVNL areas

How F Form & L Form Services works

Before a DISCOM in Rajasthan releases a new electricity connection, a load extension or a reconnection, it needs proof that the consumer’s electrical installation is safe to energise. Under the CEA (Measures relating to Safety and Electric Supply) Regulations, this proof is given through prescribed certificates. In practice these are the F Form and L Form certificates, which record the inspection and testing of the installation and confirm that it complies with the regulations.

A form that is incomplete, signed by the wrong person or based on test values that do not meet the requirements is one of the most common reasons a connection file is returned by the DISCOM. The forms must reflect the real condition of the installation: earthing, insulation resistance, protection, wiring and the licensed contractor and supervisor responsible for the work.

An SKE engineer in a helmet testing a live panel with a clamp meter

What our F Form & L Form Services service covers

01

Installation inspection

Wiring, panels, protection and clearances checked against CEA requirements.

02

Earthing test

Earth electrode resistance measured and recorded.

03

Insulation (Megger) test

Insulation resistance of wiring and cables measured.

04

Protection check

MCB / MCCB / RCD ratings and operation verified.

05

F Form & L Form preparation

Forms completed with correct details, test values and signatures.

06

DISCOM submission support

Forms attached to the connection file and queries answered.

Documents for F Form & L Form Services

  • Connection or load extension application details
  • Connected load list
  • Wiring layout / single line diagram (if available)
  • Licensed electrical contractor and supervisor details
  • Earlier test reports (for existing installations)
  • Identity and premises documents of the applicant

Open your document checklist in the customer portal

Reports and approval letters

  • Installation inspection
  • Earth resistance and insulation test results
  • List of defects to be corrected (if any)
  • Completed F Form and L Form
  • Support with DISCOM queries

Regulations behind F Form & L Form Services

  • CEA (Measures relating to Safety and Electric Supply) Regulations, 2023, as amended
  • Rajasthan licensing rules of 2016 for electrical contractors and supervisors
  • RERC Electricity Supply Code and DISCOM connection procedures

F Form & L Form Services in 6 steps

The exact form, who may sign it and the test values required depend on the voltage and type of installation and on current DISCOM procedure. We confirm what applies to your connection before preparing the forms.

The SKE team in helmets and high-visibility vests at a solar site
  1. 1

    Details

    Load & installation

  2. 2

    Inspection

    Site check

  3. 3

    Testing

    Earth & IR tests

  4. 4

    Corrections

    Defects fixed

  5. 5

    Forms

    F & L Forms prepared

  6. 6

    Submission

    With DISCOM file

Questions about F Form & L Form Services

Answered by our engineers. Ask us if yours is not here.

Ask an engineer

What are F Form and L Form?

They are the certificates required under the CEA safety regulations to certify that an electrical installation has been inspected and tested and is safe to connect, before the DISCOM releases an electricity connection.

When are F Form and L Form needed?

They are needed with applications for a new electricity connection and typically for load extensions or reconnections, where the installation has to be certified before supply is given.

Who can sign the forms?

The forms are completed on the basis of inspection and testing by the licensed contractor or authorised person as required by the regulations and DISCOM procedure. We make sure the right person signs with the correct details.

What tests are required?

Typically earth resistance and insulation resistance tests, along with checks of protection devices and wiring. The values are recorded on the forms.

My DISCOM returned the file because of the forms. Can you help?

Yes. We check what the DISCOM objected to, re-test if needed and prepare corrected forms.

F Form & L Form Services across all 41 districts of Rajasthan

We handle this work with all three DISCOMs, from our Jaipur office. Find your area:

Cities: Jaipur · Jodhpur · Udaipur · Kota · Ajmer · Bhilwara · Bikaner · Alwar and Bhiwadi · Sikar · Barmer and Balotra

WhatsApp