Solar Feasibility Study for Rooftop and Ground-mounted Plants in Rajasthan

An independent study of whether solar works for your site: capacity, generation, grid connection, the rules that apply, cost, savings and payback.

Engineers inspecting rooftop solar modules and inverters on a city rooftop
Since 2008All Rajasthan
JVVNL, AVVNL and JdVVNL areas

How Solar Feasibility Study works

Rajasthan has some of the best solar resource in India, but whether a project pays back depends on the site, your consumption, the grid connection and the regulations that apply: net metering, gross metering, captive use or open access.

Our feasibility study looks at the site (roof or land, shading, structure), estimates generation, sizes the plant against your load and sanctioned demand, checks grid connectivity and the evacuation arrangement, and works out cost, savings and payback under the applicable RERC regulations and tariffs.

An SKE engineer on a rooftop solar plant above the city

What our Solar Feasibility Study service covers

01

Site assessment

Roof or land, shading, orientation and structure.

02

Generation estimate

Expected yearly generation from solar data.

03

Capacity sizing

Sized against load, sanctioned demand and rules.

04

Grid connectivity

Connection voltage, substation and evacuation.

05

Regulatory route

Net metering, captive or open access.

06

Financials

Cost, savings, payback and IRR.

Documents for Solar Feasibility Study

  • Last 12 months electricity bills
  • Site plan or roof drawings
  • Land documents (for ground-mounted plants)
  • Sanctioned load or contract demand
  • Any DISCOM or RRECL correspondence

Open your document checklist in the customer portal

Reports and approval letters

  • Feasibility report
  • Preliminary layout and capacity
  • Generation estimate
  • Grid connectivity assessment
  • Cost, savings and payback analysis
  • Recommended regulatory route

Regulations behind Solar Feasibility Study

  • RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021, as amended
  • Rajasthan Integrated Clean Energy Policy and RERC open access regulations
  • CEA Technical Standards for Connectivity of Distributed Generation Resources

Solar Feasibility Study in 6 steps

Generation and savings are estimates from solar data and current tariffs; actual results depend on weather, performance and future tariff changes.

The SKE team in helmets and high-visibility vests at a solar site
  1. 1

    Data

    Bills, site and load

  2. 2

    Site visit

    Roof or land survey

  3. 3

    Design

    Layout and capacity

  4. 4

    Grid

    Connectivity options

  5. 5

    Financials

    Cost and payback

  6. 6

    Report

    Recommendation

Questions about Solar Feasibility Study

Answered by our engineers. Ask us if yours is not here.

Ask an engineer

Is my roof suitable for solar?

It depends on area, shading, orientation and the structure’s strength. The site assessment answers this before you spend on a vendor.

How big a system can I install?

Under net metering in Rajasthan the limit depends on your sanctioned load and the current RERC rules. Above that, captive or open access may suit you better.

What payback can I expect?

It depends on your tariff, consumption and system cost. The study calculates it for your case.

Do you handle approvals after the study?

Yes. We handle net metering, CEIG approval and open access applications for the project.

Solar Feasibility Study across all 41 districts of Rajasthan

We handle this work with all three DISCOMs, from our Jaipur office. Find your area:

Cities: Jaipur · Jodhpur · Udaipur · Kota · Ajmer · Bhilwara · Bikaner · Alwar and Bhiwadi · Sikar · Barmer and Balotra

WhatsApp