Virtual Net Metering (VNM) & Group Net Metering (GNM) Consultancy in Rajasthan

Feasibility, structuring and approvals for Virtual Net Metering and Group Net Metering solar projects under the RERC Distributed Renewable Energy (Third Amendment) Regulations, 2025.

Engineers inspecting rooftop solar modules and inverters on a city rooftop
Since 2008All Rajasthan
JVVNL, AVVNL and JdVVNL areas

How Virtual (VNM) & Group Net Metering (GNM) works

Many consumers cannot install solar where they use electricity, because the rooftop is too small, shaded or not owned by them, or because they have many small connections. Virtual Net Metering (VNM) and Group Net Metering (GNM) solve this by letting energy from one solar plant be credited across several electricity connections.

Rajasthan introduced VNM and GNM through the RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (Third Amendment) Regulations, 2025. Under these regulations, distributed renewable systems between 1 kW and 1 MW can be set up under virtual or group net metering across consumer categories. In GNM, surplus at one connection is adjusted against other connections of the same consumer; in VNM, credits are shared among participating consumers in agreed ratios.

An SKE engineer on a rooftop solar plant above the city

What our Virtual (VNM) & Group Net Metering (GNM) service covers

01

VNM vs GNM vs GEOA

Comparison of arrangements for your load and contract demand.

02

Credit modelling

Energy and credit allocation across connections modelled.

03

Structuring

Allocation ratios, agreements and responsibilities among participants.

04

DISCOM application

Application for technical feasibility and connectivity.

05

Approvals

CEIG approval and metering coordinated where required.

06

Billing check

First bills checked to make sure credits are applied correctly.

Documents for Virtual (VNM) & Group Net Metering (GNM)

  • Electricity bills of all participating connections
  • Sanctioned load and contract demand details
  • Plant location and ownership / rights document
  • Allocation ratios and consent of participants (VNM)
  • Plant design and SLD
  • Existing net metering agreement (if switching)

Open your document checklist in the customer portal

Reports and approval letters

  • Feasibility and option comparison
  • Credit allocation model
  • Application file
  • Approval coordination
  • Billing verification

Regulations behind Virtual (VNM) & Group Net Metering (GNM)

  • RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021
  • RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (Third Amendment) Regulations, 2025
  • DISCOM procedures for VNM / GNM implementation

Virtual (VNM) & Group Net Metering (GNM) in 6 steps

DISCOM implementation procedures for VNM and GNM are still developing, so timelines can vary. We track the latest DISCOM instructions and plan around them.

The SKE team in helmets and high-visibility vests at a solar site
  1. 1

    Assessment

    Connections & load

  2. 2

    Option choice

    VNM / GNM / GEOA

  3. 3

    Structuring

    Ratios & agreements

  4. 4

    Application

    DISCOM feasibility

  5. 5

    Installation

    Plant & metering

  6. 6

    Credit check

    Bills verified

Questions about Virtual (VNM) & Group Net Metering (GNM)

Answered by our engineers. Ask us if yours is not here.

Ask an engineer

What is the difference between virtual and group net metering?

In group net metering, surplus solar energy at one connection is adjusted against other connections of the same consumer. In virtual net metering, energy from one plant is shared among several participating consumers in agreed ratios.

What plant size is allowed under VNM / GNM in Rajasthan?

The 2025 amendment allows distributed renewable systems between 1 kW and 1 MW under virtual or group net metering, across consumer categories.

Can I switch from net metering to group net metering?

Yes, but the existing net metering agreement has to be terminated first. We help plan the switch so you do not lose credits.

Should I choose VNM / GNM or green energy open access?

Consumers in certain contract demand ranges can choose between these options. The right choice depends on load, location and cost, which we compare for you.

Is a technical feasibility study needed?

For many cases yes. The regulations exempt small domestic systems (up to 10 kW) from the DISCOM feasibility study. We confirm what applies to your case.

Virtual (VNM) & Group Net Metering (GNM) across all 41 districts of Rajasthan