- Home
- Calculators
Electrical calculators, built for Rajasthan
Free calculators for contractors, solar installers, consultants and plant engineers. Results as you type, with the formula and the rule behind each one.
- 31
- calculators
- 2025
- RERC tariff and TCOS rules
- reports on the SKE letterhead
- ₹0
- free, no sign-up
Most used
Cable size calculator
Size LT power cables for current carrying capacity and voltage drop, with derating for Rajasthan temperatures, grouping and laying method.
Open
HT electricity bill calculator (Rajasthan 2025)
Estimate a Rajasthan HT bill: fixed charges on billing demand, energy charges, ToD rebate and surcharge, power factor incentive or penalty, excess demand, load factor and voltage rebates.
Open
Solar BOM generator
A complete bill of materials for an on-grid solar plant: modules, inverter, structure, DC and AC cables, protection, earthing and metering. Download as PDF or Excel.
Open
Battery storage for peak shaving and demand charges
Battery kW and kWh to cut your maximum demand, the monthly saving on fixed charges and excess-demand penalties, and payback, using the Rajasthan 2025 tariff.
Open
Amps, kW and kVA converter
Convert amps to kW and kVA, or kW and kVA to amps, for single and three phase at any voltage and power factor.
Open
Connected load for a new LT connection (Rajasthan)
Work out connected load the way JVVNL, AVVNL and JdVVNL assess it under the Terms and Conditions for Supply 2021, with diversity and the supply type you qualify for.
Open
Conversions and basics
Amps, kW, kVA, HP, Ohm's law, motor current and units.
- Amps, kW and kVA converter Convert amps to kW and kVA, or kW and kVA to amps, for single and three phase at any voltage and power factor.
- Power triangle: kW, kVA, kVAR and power factor Find kVA, kVAR and phase angle from kW and power factor, and the kVAR needed to reach a target power factor.
- HP and kW converter Convert horsepower to kW and back, with the input power a motor draws at its efficiency.
- Ohm's law and power calculator Enter any two of voltage, current, resistance and power to find the other two.
- Motor full load current Full load current of single and three phase induction motors from HP or kW, efficiency and power factor, with starting current.
- Units (kWh) and electricity cost Units consumed and cost per day, month and year for any appliance or machine from its load and running hours.
- Conductor resistance at temperature DC resistance of copper and aluminium conductors from size, length and temperature.
Cables, earthing and protection
Cable size, voltage drop, losses, earthing, fault level and breakers.
- Cable size calculator Size LT power cables for current carrying capacity and voltage drop, with derating for Rajasthan temperatures, grouping and laying method. PDF
- Voltage drop calculator Voltage drop in volts and percent for copper and aluminium cables, single and three phase.
- Cable losses and the cost of an undersized cable Watts lost in a cable, units and rupees lost per year, and the payback of the next cable size up.
- Earthing conductor and earth strip size Minimum cross-section of copper, aluminium and GI earthing conductors for a fault current and duration, as per IS 3043.
- Earth electrode resistance Resistance of a pipe or rod earth electrode from soil resistivity, length and diameter, and the number of pits for a target.
- Fault level at the transformer secondary Three phase short circuit current at the LV side of a distribution transformer from its kVA and impedance.
- Breaker rating for a load Suggested MCB or MCCB rating for a load in kW or amps, with the continuous-load margin.
- Cable short circuit rating Short time current a cable can carry for a given time, or the minimum size for a fault level.
Solar EPC
String sizing, DC cables, losses and yield, roof area and a full BOM.
- Solar string sizing Maximum and minimum modules per string for your inverter, checked at Rajasthan's coldest morning and hottest afternoon.
- Solar DC cable size and loss Voltage drop and power loss in solar DC string cables, to choose between 4, 6 and 10 mm² copper.
- Solar loss budget, PR and yearly generation Expected yearly units from a solar plant in Rajasthan, built up from the main losses, with performance ratio and savings.
- How much solar fits on a roof Solar capacity that fits on an RCC roof, tin shed or ground area, or the area needed for a target kWp.
- Solar BOM generator A complete bill of materials for an on-grid solar plant: modules, inverter, structure, DC and AC cables, protection, earthing and metering. Download as PDF or Excel. PDF
Battery storage (BESS)
Peak shaving, time-of-day shifting, DG replacement and storage cost.
- Battery storage for peak shaving and demand charges Battery kW and kWh to cut your maximum demand, the monthly saving on fixed charges and excess-demand penalties, and payback, using the Rajasthan 2025 tariff. PDF
- Solar + battery: shifting energy to the evening peak Savings from storing midday solar or off-peak grid power and using it in the 6 to 10 pm peak, with Rajasthan ToD rebates and surcharges.
- Battery backup instead of a DG set Battery size for your backup hours and the diesel, maintenance and cost a battery saves against a DG set.
- Battery storage cost per kWh delivered Lifetime cost of each unit a battery delivers, from installed cost, cycles, depth of discharge, efficiency, degradation and O&M.
Load, tariff and equipment
Rajasthan load rules, HT bill, power factor, transformers and DG sets.
- Connected load for a new LT connection (Rajasthan) Work out connected load the way JVVNL, AVVNL and JdVVNL assess it under the Terms and Conditions for Supply 2021, with diversity and the supply type you qualify for.
- Estimated design demand and transformer size (TCOS 7.5) Estimated design demand for flats, plots, commercial buildings, resorts and industrial plots under Rajasthan DISCOM norms, with kVA, supply voltage and transformer size. PDF
- Transformer size Distribution transformer kVA from connected load, demand factor, power factor, growth and preferred loading.
- Transformer losses and their yearly cost No-load and load losses of a transformer in kWh and rupees per year, and the saving from a more efficient unit.
- DG set size Diesel generator kVA for running load and the largest motor's starting kVA.
- HT electricity bill calculator (Rajasthan 2025) Estimate a Rajasthan HT bill: fixed charges on billing demand, energy charges, ToD rebate and surcharge, power factor incentive or penalty, excess demand, load factor and voltage rebates. PDF
- Power factor surcharge or incentive on your bill Surcharge for power factor below 0.90 and incentive above 0.95 under the Rajasthan 2025 tariff, and the capacitor kVAR to fix it.
- Capacitor bank (kVAR) calculatorCapacitor kVAR to raise power factor and avoid the surcharge.
No calculator matches. Ask an engineer: +91 95213 89292